Settling in:

  1. Application
  2. Submitting an investor application
  3. Administrational compliance assessment of the application
  4. Evaluation of the applicant
  5. Assessment of application compliance
  6. Qualitative evaluation of the application
  7. Drawing the investor contract
  8. Signing the contract

30 ha
Area in ALEX innovation park
30 MW
Electricity installation

In the 30 hectares of ALEX innovation park 20 plots have been formed, where investors, who are ready to develop their own infrastructure (buildings), are welcome to settle in.

A network of 8 local streets with sidewalks and bicycle paths has been built in the territory as well as rainwater gutters and street lighting.

Up to 30 MW electricity installation is designed for the park and there is a possibility to connect to the central heating system.

Costs & documents

According to the expected pace of construction and the nature of activity, the territory of ALEX Innovation Park is divided into 20 investment zones, each of which has a corresponding value per acre.

The settlement fee is calculated using a certain formula. It can be reduced depending on the intended results – the sum of investment, the number of jobs, the potential of the planned investment.

The rent rates for premises in “Innovation hangar” are from 7.5 to 8.63 EUR per square metre (without VAT) – the final price depends on the assessment of the application submitted by the investor and the points received.